NOLENSVILLE PIKE ALL-ACCESS CORRIDOR
The Community Advisory Board
Metro is redesigning Nolensville Pike, and a community advisory board is part of how. This page explains what the board is, where the project stands, what the board has discussed, and how to get your question into the room.
NOLENSVILLE ROAD
What the board is
ADVISORY
It advises. It doesn't decide.
The board doesn't approve designs or contracts. Members are a sounding board for the project team.
WORKING SESSIONS
Not public meetings.
Board meetings are working sessions, not public meetings. That is why we report back here after each one.
VOICE ON THE CAB
On the Board
Julie James, president of 16th United, holds one of the seats through a roughly two-year appointment from the Mayor's Office. It is an honor to serve, and a chance to be a voice for the neighbors who make up our group.
The board is part of Choose How You Move, the Mayor's transportation program. Nolensville Pike is one of its All-Access Corridors.
AS PRESENTED TO THE BOARD, NOVEMBER 19, 2026
Where the project stands
Dates are targets and can move. We'll update this page when they do.
The scope
Nolensville Pike is 9 of the 54 miles of All-Access Corridors in the program.
Now
HDR, the firm leading the design, is in a 24-month first phase that runs to 30% design and a locally preferred alternative: the design option the team recommends moving forward with.
Jan-Feb 2027
Public engagement begins.
About April 2027
The team refines the alternatives.
About June 2027
Target for choosing the locally preferred alternative.
After that
Right-of-way work, including certified letters to affected property owners.
THEMES
What the Board Discussed
Here are the topics discussed, not specific details, and not who said what.
Meeting 2 · November 19 · SNAP Community Center
A range of designs
The team described the options as a spectrum, from dedicated bus lanes to mixed traffic, and shared a case study from Richmond, Virginia.
Signals
Signals along the Pike are being modernized and connected by fiber.
Safety
Members described current safety on the corridor as very poor.
The small things
Crosswalk and bus stop placement, angled parking, sidewalk gaps, lighting, and cut-through traffic on side streets.
Reaching everyone
Metro's Hub Nashville service isn't offered in multiple languages, and outreach has a gap with businesses and the landlords who own their buildings.
Quick fixes
Members raised low-cost, short-term changes, sometimes called tactical urbanism, that could happen before construction.
Meeting 1 · September 17 · Coleman Park Community Center
Safety in every sense: crossing the street, short signals for seniors, riding the bus alone or with children. Transit as a necessity, not a nice-to-have. And a shared view that trust has to be earned here, so Metro would need to over-communicate.
YOUR TURN
Send us your question, idea, or concern
Julie takes what you send to the board and the project team. We read every message. We won't publish your name or your message; when we report back, we describe themes.
This form goes to 16th United, not to Metro
To put a comment on Metro's record, use Choose How You Move's own channels:
-
Share your thoughts: choosehowyoumove.nashville.gov
-
Nolensville Pike input page: publicinput.com/x53728
-
Email updates: publicinput.com/chymsubscription
-
transit@nashville.gov · (615) 862-6000